What does a flexible connection mean for your site?

This page replays one year of real data-centre demand, half-hour by half-hour. Set an import limit and when it applies. The page shows how often the limit applies, what a battery covers, and what is left for cooling and IT.

Data: UK Power Networks open data (CC BY 4.0). The profile is the UK Power Networks standard data-centre demand profile. UK Power Networks built it from at least 10 connected data-centre sites and uses it for import curtailment studies. It is not one site. We scale it to a site with 20 MW import capacity. Illustration, not advice. Source and method

Your connection

Your battery

Site loadImport limitGrid import after batteryImport above limitLimit applies

Source and method